How-To
Step-by-step task recipes for setting up and using SmartFlow APS in Business Central.
Your First Finite Schedule in SmartFlow APS
A numbered walkthrough of running your first finite schedule in SmartFlow APS, from prerequisites through Accept and verifying the result in Business Central.
Model Shifts and Shop Calendars in Business Central
A step-by-step guide to setting up work shifts, shop calendars, holidays, and calculated capacity for a work center in Business Central.
Set Up Constraint Types, Product Attributes, and the Changeover Matrix
A field-by-field walkthrough of configuring SmartFlow APS's constraint types, tagging items with attribute values, and filling in an asymmetric changeover matrix.
Find and Cut Changeover Waste with Sequence Optimization
How to baseline your current sequence, run the SmartFlow APS optimizer, and read the before/after comparison to decide what to accept.
Explore SmartFlow APS with the Built-In Demo Datasets
How to generate one of SmartFlow APS's six industry demo datasets, each seeded with a real overload for finite scheduling to resolve.